A-17 · House · Merkez, Bolu

Mountain House

A two-storey weekend house in a Bolu pine forest, built in timber frame under a steep gabled roof.

Location
Merkez, Bolu
Year
2025 – 2026 (target)
Area
260 m² · plot 1,800 m²
Status
Ongoing%77
Type
House
Services
Architecture, Interior architecture
Client
Private homeowner
Floors · scale
Z+1 · 1:100
Team
Selin Barutçu (Project architect) · İpek Durukan (Interior architect)
Collaborators — sample
Structural engineering: Örnek Ahşap Mühendislik · Contractor: Örnek Ahşap Yapı

Stage · in progress

%77 complete

On site · %64
  1. Concept

    %100

    Jan 2025 – Apr 2025

  2. Preliminary design

    %100

    Apr 2025 – Jun 2025

  3. Construction drawings

    %100

    Jun 2025 – Sept 2025

  4. Permit

    %100

    Sept 2025 – Nov 2025

  5. On site

    %64

    Nov 2025 – Aug 2026

  6. Handover

    %0

    Aug 2026 – Sept 2026

Next milestoneRoof cladding12 November 2026

01 Idea

A weekend house in a Bolu pine forest: the client wanted a place where nothing would distract when escaping the city, lived with snow in winter and coolness in summer. With its steep gabled roof, the house recalls the region’s traditional upland houses without imitating them. A plain volume gathered under a single roof; the pitch is set to carry the snow load and let it slide off. We want it to stand in the forest as upright and lean as the tree trunks.

Mountain House — project photograph

02 Space

The ground floor is a single large room: kitchen, dining and sitting around a central stone fireplace mass. The fireplace is also the building’s spine, carrying the stair and the flue. Upstairs, two bedrooms and a study corner sit beneath the roof, and the pitch is felt inside the rooms. On the entrance side there is a buffer hall for snow boots, skis and firewood. A deep west-facing veranda reaches out to the edge of the forest.

Mountain House — project photograph

03 Material and construction

The house is a timber frame of local pine; the frame and roof rafters are now complete, and roof cladding is beginning. The timber structure sits on a stone basement wall, with a ventilated gap between ground moisture and timber. External cladding is charred timber boarding; the roof is dark anthracite zinc. In the wall build-up we use wood-fibre insulation; for winter comfort the U-value approaches passive-house level. Interior surfaces are pale spruce and lime plaster.

Mountain House — project photograph

04 Light

In the forest, light filters between the trees and shifts throughout the day. We positioned the windows according to the gaps between trunks; each frames not a panorama but a particular group of trees. A single roof window brings skylight into the stair void upstairs. On winter evenings the fireplace will be the house’s main source of light; we kept artificial light warm and low. From outside, the house will appear as a few warm windows in the dark forest.

Mountain House

Time of day

13:00

Light temperature and shadow direction change with the hour. The night view shows interior light on the facade as a restrained tonal layer (simulation).

Drawing set

From site plan to detail.

1234ABC45050045014005005001000LIVING47,5 m²KITCHEN22,5 m²BEDROOM22,5 m²STAIR12,5 m²BATH12,5 m²DINING22,5 m²AA±0.00N00.5124m1:100
%100

Ctrl + wheel or pinch to zoom, drag to pan. The scale bar scales with the drawing.

Drawing ↔ photograph

A perspective trace of the same frame. Drag the handle or use the arrow keys.

Mountain House
DRAWINGPHOTOGRAPH

Material palette

Few materials, ageing well.

  • Charred timber cladding

    M-01

    Charred timber cladding

    Charred and brushed, unoiled

    External walls

  • Zinc

    M-02

    Zinc

    Anthracite, standing seam

    Roof

  • Local stone

    M-03

    Local stone

    Split face

    Basement wall, fireplace

  • Lime plaster

    M-04

    Lime plaster

    Matt, off-white

    Interior walls

  • Oak flooring

    M-05

    Oak flooring

    Wide plank, soap finish

    Floors

Site diary

From site, in order.

  1. The roof underlay was laid; zinc cladding starts in early November.

    — Selin Barutçu

    Mountain House site, 23 October 2026
  2. Wall insulation and the vapour control layer were installed; an airtightness test was carried out.

    — Selin Barutçu

    Mountain House site, 29 September 2026
  3. Roof rafters and wind bracing are complete.

    — Selin Barutçu

    Mountain House site, 26 August 2026
  4. A sample corner of the fireplace stonework was built with the mason.

    — İpek Durukan

    Mountain House site, 15 July 2026
  5. Timber frame members arrived from the workshop; assembly was completed in two weeks.

    — Selin Barutçu

    Mountain House site, 2 June 2026
  6. The stone basement walls are complete; drainage and waterproofing installed.

    — Selin Barutçu

    Mountain House site, 28 April 2026
  7. Site access began as soon as the snow melted; tree protection fences were put up.

    — Selin Barutçu

    Mountain House site, 24 March 2026

Gallery

4 frames

Related projects

Similar scale, similar questions.

Briefikir · 0541 473 82 26

Let us build this for your studio

Briefikir builds and launches your architecture website with a project portfolio, drawing viewer, enquiry wizard and studio panel.

Get a quote